
Add to Cart
tropical area polytunnel sawtootch greenhouse with cooling irrigation system
The sawtooth greenhouse is a type of greenhouse structure characterized by its unique
roof design, which resembles the tooth of a saw. The design consists of pitched roof sections
with alternating peaks and vealleys, creating a sawtooth profile when viewed from the sides.
The sawtooth greenhouses offer a combination of natural ventilation, effient light distribution,
and aesthetic appeal, making them suitable for a wide a range of agricultural and horiticultural
application.
Main framework material | hot dip galvanized steel structure |
Covering material | plastic film |
Product use | vegetable, fruit,flower, |
Width | 8m/9m/10m, customized |
Length | 30-60m, customized |
Details
1. Framework
The main galvanized steel is hot galvanized steel pipe.
2. Shading system
You can choose the shading system according to your request
3. Cooling system
The cooling system is composed by cooling fan and cooling pad, which can reduce the
temperature in summer.
4. Ventilation system
Manual and electical side ventilation and roof ventilation are all optional
About US
Our main products comprise glass multi-span greenhouse, PC-sheet multi-span greenhouse,
plastic-film multi-span greenhouse and solar greenhouse etc.
Moreover, we also have greenhouse materials, they can match all the kinds of greenhouse.
Such as, skeleton system, aluminum-profile system, covering system, shading system,
ventilation system, cooling system, heating system, seedbed system & irrigation system,
hydroponics System.
FAQ
1. How long is the delivery time?
According to your greenhouse size and system, the delivery time is usually 15-60 days.
2. Can you supply sample?
Small parts can be supplied, but you should pay the express cost.
3. Can your company supply greenhouse design?
Our company can give greenhouse design according to your land and plan after deposit.
And we can give simple drawing before signing contract.
4. How to install greenhouse ?
Firstly we prepare the material and send the material to your city.
After your customs clearing, we send 2-4 engineers or all workers to guide to install.
If you want to save money, we only send engineers, and you match local workers.
If you think it is hard to build the greenhouse, we also can send engineers and workers to
install for you.
5. When installing, what cost should we pay?
Our engineers and workers visas and round-trip tickets, their foods and accommodation,
their communication.